Now Hiring: Are you a driven and motivated 1st Line IT Support Engineer?

System Study

System Study

FEASIBILITY STUDY

The feasibility of the project is analyzed in this phase and business proposal is put forth with a very general plan for the project and some cost estimates. During system analysis the feasibility study of the proposed system is to be carried out. This is to ensure that the proposed system is not a burden to the company. For feasibility analysis, some understanding of the major requirements for the system is essential.

Three key considerations involved in the feasibility analysis are

ECONOMICAL FEASIBILITY
This study is carried out to check the economic impact that the system will have on the organization. The amount of fund that the company can pour into the research and development of the system is limited. The expenditures must be justified. Thus the developed system as well within the budget and this was achieved because most of the technologies used are freely available. Only the customized products had to be purchased.
SOCIAL FEASIBILITY
The aspect of study is to check the level of acceptance of the system by the user. This includes the process of training the user to use the system efficiently. The user must not feel threatened by the system, instead must accept it as a necessity. The level of acceptance by the users solely depends on the methods that are employed to educate the user about the system and to make him familiar with it. His level of confidence must be raised so that he is also able to make some constructive criticism, which is welcomed, as he is the final user of the system.
PROPOSED SYSTEM
The proposed system provides another way to packing and moving goods from one place to another place. In that, packing and moving goods from one place to another are done through online process. The main aim of this project is to make packing and moving process contain registration, the transportation details, services provided by them are all been performed through online.
TECHNICAL FEASIBILITY
This study is carried out to check the technical feasibility, that is, the technical requirements of the system. Any system developed must not have a high demand on the available technical resources. This will lead to high demands on the available technical resources. This will lead to high demands being placed on the client. The developed system must have a modest requirement, as only minimal or null changes are required for implementing this system.
EXISTING SYSTEM
In the existing system, all the works are done in manual. The packing and moving goods details which are entered manual from office itself. So the customer has certain difficulties to transfer their goods from one place to another place. It is also difficult to calculate and maintain the transportation charge, loading and unloading charge because everything done manual. Users work is tedious.

SYSTEM REQUIREMENTS

Software Requirements
Operating System
Windows XP professional, WIN7, WIN10
Front End
Asp.Net
Back End
SQL Server 2000
Coding Language
C# .Net
Hardware Requirements
Processor
Pentium III / IV
Hard Disk
40 GB
Ram
256 MB
Monitor
15VGA Color
Mouse
Ball / Optical
Keyboard
102 Keys